FWD was retained to report on the condition of the existing Oxford Building Chilled Water Plant and provide options for system repair or replacement. Based on the assessment, FWD was employed to design and oversee the construction of a multi-circuited refrigeration system which included interlaced refrigerant cooling coils, a central roof mounted condensing unit and a refrigerant monitoring/detection system. FWD acted as the project Prime Consultant and oversaw electrical and structural designs.