Brian Canfield Centre

FWD undertook mechanical designs and prime consulting for upgrade of the Telus, Brian Canfield Centre “The Boot” in Burnaby. The chiller plant with a total cooling capacity of 1,350 tons was comprised of three water cooled chillers (two with variable speed technology), two cooling towers, variable speed primary/secondary pumping arrangements and various piping modifications to increase efficiency. As the upgrade resulted in significant operational energy savings, FWD assisted the Client in application for and receipt of a BC Hydro Power Smart incentive bonus.